Methods of Initial Assessment for Safety Secondary Application of Duroplastic Waste

Abstract

The powder recyclate was obtained through the mechanical processing of GRP waste (pipes,wind turbine blades). Currently, there are no specific quality requirements or standards for such secondary material due to the lack of its large scale usage. However, pending regulations dedicated to the secondary markets, it is necessary to develop facilitate the potential introduction of the material on an industrial scale. The recyclate was analyzed using gas chromatography (GC), high-performance liquid chromatography (HPLC), and Fourier-transform infrared spectroscopy (FTIR).

Author (co-authors)
First name Last name Institutional affiliation E-mail Phone number ORCID ID Academic status, position Institution address Author contribution(s) Institutional affiliation
Alicja
Matusiak
alicja.matusiak@iel.lukasiewicz.gov.pl
0009-0005-1537-1781
Poland, 04-703 Warszawa, 28 Mieczysława Pożaryskiego street
Methodology
Writing – Original Draft Preparation
Łukasiewicz Research Network – Institute of Electrical Engineering
Ewa
Zawadzka
ewa.zawadzka@iel.lukasiewicz.gov.pl
0000-0002-9735-5283
Poland, 04-703 Warszawa, 28 Mieczysława Pożaryskiego street
Supervision
Łukasiewicz Research Network – Institute of Electrical Engineering
Stanisław
Wacławek
stanislaw.waclawek@tul.cz
0000-0002-8430-8269
Czech Republic, Liberec 1 460 01, Studentská 1402/2
Methodology
Technical University of Liberec
Daniele
Silvestri
daniele.silvestri@tul.cz
0000-0002-5657-4818
Czech Republic, Liberec 1 460 01, Studentská 1402/2
Methodology
Technical University of Liberec
Alicja
Wypiór
alicja.wypior@iel.lukasiewicz.gov.pl
0009-0006-5311-0627
Poland, 04-703 Warszawa, 28 Mieczysława Pożaryskiego street
Writing – Original Draft Preparation
Łukasiewicz Research Network – Institute of Electrical Engineering