Abstract
The paper compares rule-based and day-ahead linear-programming control of a 400 kWh battery storage operating with a 298 kW photovoltaic plant at a machine-building enterprise. Simulation in MATLAB/Simulink for three seasons shows that optimal scheduling reduces daily electricity costs by 20.9–25.7 % and cuts winter contracted-capacity exceedance 26-fold.
Keywords (in English)
Manuscript file